Project Logs v2 (**DRAFT**)

Project Logs v2 (**DRAFT**)

Log of Project & Enhancement Proposals or Requests Submitted

 

Project

Date 
Recv'd

Sponsoring Unit

Project

Contacts

Estimated Budget

Request Status 
(Not Evaluated / Reviewed/ 
Pending / 
Approved/ Rejected/ Deferred)

Current Status
 
Migration of EMS database from athletics IT to OIT DBA team
02-03-2016AthleticsMigrating database for "Event Management Software" used by Athletics and other departments on campus from Athletics IT administered VM to DBA team existing MSSQL Server.David Da Costa
$0.00
Work in Progress 
 
Background Check Replacement Project
01-12-2016Human Resources and Police DepartmentThe current background check application runs on Access database that has become obsolete and unstable. The application itself contains information related to a potential hire's background check result that may be sensitive and data must be retained for a 5 year period. Both Human Resources and Police Department rely on this application to complete the hiring process. Lately its instability has become a great concern to both IT support and the users. 

OIT is proposing Case Manager as a potential replacement solution as it offers a more robust and secure environment. Functional users are agreeable to this proposal. 

Additional information on the current process can be found here: https://uci.atlassian.net/wiki/display/adcom/Background+Check+Process+Meeting+2015-02-18 
Christa Chen
$20,000.00
PendingMeeting with Functional Users on 1/25 to discuss project requirements
 
On-line day off request form for Hospitality & Dining Services
02-12-2016Hospitality & Dining ServicesThis form automatically routes days off requests to the appropriate supervisor in the correct dining facility.Kevin Ansel
$0.00
PendingPlanning 
 
Financial Request Submission
02-12-2016Vice Chancellor of Student Affairs Budget OfficeWeb based tool used to submit a request for project fundingKevin Ansel
$0.00
PendingIn Planning 
 
California Dream Loan, new institutional loan beginning 2015-2016
02-11-2016UC Office of the President, Office of Financial Aid & ScholarshipsCalifornia Dream Loan is a new institutional loan that is initiated by UC Office of the President.Rebecca Sanchez, I-Rong Lin, Lindsay Crowell, Kathy Gorelick, Julie Magana
$0.00
Work in ProgressPreparation for a project plan including tasks, resources, integrations, TILA disclosure, and implementation timeline. 
 
Conversion of ARC Ledger file from FS accounting unit to KFS COA before uploading to KFS
02-11-2016Accounting and Fiscal ServicesTo more accurately map FS accounting units into KFS chart of account. Instead of utilizing KFS black box conversion process, we will update ARC Ledger file with KFS COA based on KFS COA from the source of where the invoice is originated before uploading ARC ledger file to KFS.Marc Guerra, I-Rong Lin, Julie Magana, Nasim Mohebbi
$0.00
PendingPreparation for a project plan identifying technical lead, developers, details tasks, and production implementation schedule. 
 
[vt] Top Project
02-11-2016FacilitiesTesting on Project ClassVictor Tam, Jyoti Razdan
$0.00
Pending  
 
Enhance the Research Administration Committee Calendar to match the theme/style of the OR website
01-29-2016Office of ResearchConsider reskinning the ORA calendar web app (https://apps.research.uci.edu/oracalendar) or switch to producing a JSON data feed where the OR website can consume and present it. The latter approach was done with the ORA Staff Directory.Rajnish Sinha
$0.00
PendingBeverley requested. OR IT Team will inventory this and other similar apps to review with Greg Ruth before we formalize a project for any changes. 
 
Build out HR Case Management Applications Backlog
01-28-2016Human ResourcesHuman Resources has a number of processes that need to be built out as case management solutions.Carmen Roode
$150,000.00
Pending  
 
WebAdmin/WebFiles Moritorium Request (Approved)
01-28-2016RegistrarModifications to existing functionality within both WebAdmin and the WebFiles reports (generated by the Registrar's office). 

Legacy Change Request Form Attached.
Elizabeth Bennett, Joshua Jackson
$0.00
Work in ProgressProject approved by the Legacy System Change Control Board. Had initial meeting with Don and set item priority and a loose overall timeline 
 
Migrate Kuali Coeus database services from Oracle to MySQL
01-28-2016Office of Research and Office of Information Technology Eric Taggart
$0.00
Pending  
 
Migrate KC Application Servers from Solaris to Linux
01-28-2016Office of Research and Office of Information Technology Eric Taggart
$0.00
Pending  
 
ResNet Phase II Network Refresh
01-28-2016HousingPhase II of network refresh for distribution and edge equipment in residential housing inclusive of undergrad and graduate locations.Albert Gonzalez, Haamed Javaheri-Ghazvini
$1,000,000.00
PendingPlanning phase complete, awaiting funding from Housing. 
 
PI Application upgrade and UCPath retrofit
01-27-2016Budget OfficeCreate an application for tracking/reporting Principal Investigator (PI) projects.Larry Coon
$200,000.00
Pending  
 
AV Support needed for upcoming Event: CDS Scholarship Luncheon at the UClub on campus, on 2.27.2016
01-27-2016Health AdvancementAV Support needed for upcoming Event: CDS Scholarship Luncheon at the UClub on campus, on 2.27.2016 from 10:15 am - 1:00 PMJill Livingston
$0.00
Draft  
 
OR Activities for RGS/AD WIndows Domain Consolidation
01-26-2016 07:39:09Office of Research and Office of Information TechnologyCoordinate planning/resolution of accounts, security groups, network share permissions, etc.. Handle all related software/database implications.Kian Colestock, Eric Taggart, Rajnish Sinha
$150,000.00
PendingWorking on addresses inactive/unclear OR user accounts, service accounts and groups. 
 
Configure Shibboleth SSO for CITI Training and Clean-Up Related Data
01-25-2016 14:52:26Office of ResearchConfigure Shibboleth SSO for CITI Training and Clean-Up Related DataKaren Allen, Da Lu, Melanie Fabian
$0.00
Work in ProgressDa coordinated all requirements and reviewed with IT staff. Eric emailed UCI CITI Admins to setup meeting and detailed plan. 
 
Migrate EH&S Websites to Cascade and Separate EH&S Web Apps
01-20-2016 12:15:10Environmental Health and SafetyMigrate existing EH&S public web pages to Cascade Server using latest campus templates to enable user-managed content. Separate existing EH&S Java/JSP web apps into a different URL (still hosted on the abs.oit.uci.edu APP server) but a new/different DNS/URL will need to be establishedScott Bourdon, Eric Taggart, Jenifer Swann
$0.00
PendingJenifer/Eric emailed about some details for planning purposes 
 
KFS Decision Support - Workflow
01-15-2016 09:55:25Administrative and Business ServicesDevelop a KFS Workflow data mart, and any reports needed per requirements. If funding is available, Analytix DS will develop ETL scripts. Estimated cost is $30,000Marc Guerra, Susan Moore, Melissa Green, Valerie Jones, Kevin Chung
$0.00
PendingPrioritization is needed with Capital Asset data mart as well. 
 
SIS: Student AR
01-14-2016 11:21:39Student Affairs, Academic Affairs, and Administration&Business ServicesThis project is to replace Student Billing Systems (SBS), non-student invoicing systems of CBSO, and write-off & collections system ARC. As part of the requirements, we need to re-write all the integrations and develop bolt-ons pertaining to Ellucian SIS/Student AR and CRC.Brent Yunek, I-Rong Lin, Joshua Drummond, Nasim Mohebbi, Linda Sizemore, James Hsu
$0.00
Work in Progress1. Performed fit gap analyses, identified gaps, and developed CR (change request) & work-around for gaps. 
2. Identified the need for 20 plus functional components for integration with outside agencies like NSLDS, IRS, and CalPIRG, vendor solutions such as TouchNet suite, external systems like KFS Ledger & AP, Housing OSCAR, and Admissions legacy system, 
3. Set up access to Ellucian Sharepoint, training instances, and data dictionary. 
4. Received training for detail codes (aka chart of accounts), deposits, exemptions (for waiver), holds, and general person. 
5. Completed first-round of data migration for non-student, non-person "General Person" record.
 
 
SIS - Banner Recruiter Implementation for Graduate Admissions and Prospecting
01-08-2016 13:24:56Graduate Division Frances Leslie, Ruth Quinnan, Mei-Lien Young, Rachel Tam, Audra Hansen
$0.00
Work in ProgressBeginning initial configurations in Banner Recruiter (MS Dynamics) with Ellucian Consultant 
 
Tick@Lab Infrastructure Refinement
01-08-2016 13:19:27Office of ResearchResearch, configure and document Shibboleth authentication 
Configure and document rms.research.uci.edu alias and hide the "tickatlab" application context/url-path
Eric Taggart, Da Lu
$0.00
Work in ProgressShibboleth configured for all. RMS alias needs to be configured for ssl and Shibboleth. tickatlab path needs to be changed to app. 
 
GD Activities for RGS/AD Windows Domain Consolidation
01-08-2016 13:04:14Graduate Division and Office of Information TechnologyCoordinate planning/resolution of accounts, security groups, network share permissions, etc.. Handle all related software/database implications.Kian Colestock, Eric Taggart, Rachel Tam
$0.00
Work in ProgressWorking on addresses inactive/unclear GD user accounts, service accounts and groups. 
 
EH&S IT Needs Inventory and Assessment
01-08-2016 12:25:20Environmental Health and SafetyInventory and assess EH&S IT tools, activities and needs. Work with EH&S management to prioritize needs. Propose next steps to EH&S and OIT management.Dana Roode, Eric Taggart, Scott Bourdon, Jenifer Swann
$100,000.00
Work in ProgressJennifer, Eric and Noah have been updating the inventory on the wiki. Scott working with EH&S managers in preparation for a full meeting. 
 
A&BS Information Security Coordination and EIRIS Inventory Update
01-08-2016 12:20:41Administrative and Business ServicesAssess A&BS Information Security Coordination responsibilities (and recommend changes as needed) and update the EIRIS Inventory for all A&BS unitsWendell Brase, Eric Taggart, Stephanie Tenney
$0.00
Work in ProgressIn progress updating the EIRIS inventories after collecting related info. Will hold another stakeholder meeting to discuss final information and recommend possible future steps (like developing an A&BS Information Security Plan). 
 
A&BS Management Survey for 2016
01-08-2016 11:38:56Administrative and Business ServicesUpdate, conduct and close-out the annual A&BS Management Survey for the 2016 year.Wendell Brase, David Tieu, Stephanie Tenney
$0.00
Work in ProgressNothing new to report. Still awaiting paper survey to be inputed by A&BS staff before reports can be generated. 
 
Financial Closeout of Jobs
01-08-2016 11:09:58Facilities ManagementWe need to review and code and test financial closeout. Some of it may have been doneJyoti Razdan
$0.00
Pending  
 
Kuali Coeus 5.2.1 Upgrade to Kuali Research Current Baseline
01-08-2016 09:39:15Office of ResearchContribute all required UCI customizations to the new KR core, migrate from KC 5.2.1 to KR 16xx (whatever is the most current baseline version)Bruce Morgan, Noah Margolis, Barbara Inderwiesche, David Tieu, Ryan Lam, Jonathan Lew
$0.00
PendingLinux (CentOS) server connectivity established, next we need logins setup. 
 
Kuali Coeus Operations/Maintenance 2016
01-08-2016 09:33:53Office of Research Bruce Morgan, Barbara Inderwiesche, David Tieu, Jonathan Lew
$0.00
Work in ProgressPrepping for February deployment on 2/17/2016. The deployment will include a major change to cayuse interface to allow pairing and permisssions setting. KC resource references are being modified to use the new and old locations, but the resources will be in one location 
 
Microsoft Server 2003 - End of Life Project IPool - FM
01-07-2016 14:05:53Facilities ManagementWith the help of the DBA team and the vendor decommission Windows Server 2003. Install IPool on Windows server 2008 and also separate the application server and the database server.Jyoti Razdan
$0.00
Work in Progress  
 
Replacing Student Center Zotwheels station for TDS
01-06-2016 11:36:52Transportation and Distribution ServicesMini-project to replace the Zotwheels station at the Student Center location (Bilbo.pts). Requires a significant amount of custom setup at the moment.Eric Taggart, Lynn Harris, Clint Maruki, Jerry Paxton
$0.00
Work in ProgressPlanning 
 
Office of Research - MS SQL Server Migration
01-04-2016 13:39:28Office of Research Jill Kay, Rajnish Sinha
$0.00
PendingOn hold pending Graduate Division setting requirements from their similar but smaller-scope project 
 
Office of Research Network File Server Replacement
01-04-2016 13:33:29Office of ResearchReorganize content from the FS41, FS43, FS43D and S01 network folder shares into two new Windows file servers (one for general files and one for secure files). This will also address Windows Server 2003 EOL vulnerabilities referenced in other SN Projects.Mark Warner, Jill Kay, Rajnish Sinha
$0.00
Work in ProgressIn Planning 
 
Kuali Coeus Export Control Module Implementation
01-04-2016 11:54:59Office of ResearchImplement the Kuali Coeus Export Control module that Colorado State University developed or other functionality to meet Export Control tracking needs. Assess related functionality, implement it within UCI's KC instance, develop required improvements so it can be used at UCI.Bruce Morgan, Noah Margolis, Barbara Inderwiesche, David Tieu, Marcinette Copeland, Jonathan Lew
$0.00
DraftExport control team continues to review and analyze KC Negotiations module for Export Control usage. 
 
Distribution Services new mail hardware and software
12-16-2015 09:58:14Transportation and Distribution ServicesRequest by Distribution team to assist in looking at new Mail Management hardware, software changes and options provided by a new consolidated vendor, integration, and any related changes to the recharge in-house code or setup. Security analysis of the new proposed setup. Also evaluate turning over mail software support responsibilities to the vendor in a mutually managed solution.Ronald Fleming, Phillip Struck, Clint Maruki, Jerry Paxton
$0.00
Work in ProgressInitial discussion restarted 
 
SLL Sample Project
12-10-2015 16:18:40SLL ITSample project as part of learning exercise.Steven Tajiri
$0.00
Draftcurrent status 
 
Projects8i - current data in Projects 8i move to IBM 10 - FM
12-03-2015 10:39:00Facilities ManagementComplete implementation of Projects 8i will take at least 3-4 years to implement all components and processes required for tririga to be use by the Project Services PMs, PAC, Project Inspectors, Contracts and Engineers units of FM, as not all of these groups are currently utilizing TRIRIGA Projects functionality. This complete project would include fit/gap analysis of requirements vs. Tririga Functionality, Development, Testing, Documentation and training across all these groups. 

Since this time line will not work with our existing Projects8i installation due to it being unsupported and on Windows Server 2003 we would like to move the existing data into IBM 10. 
We would like an analysis on the effort involved to retire the current Projects8i and bring it into IBM 10.
Gary Krekemeyer, Jyoti Razdan, Jenifer Swann, Michael Luong
$0.00
Work in Progress  
 
Implement Leave Request Form for D&CS
12-02-2015 13:23:47Design and Construction ServicesWould like to replicate the form that is currently used at Facilities Management and Environmental Health and Safety for staff to request sick and vacation time through an online email request system. The form gets submitted to the manager and the manager approves it via email. There is a copy for the manager and the staff documenting the request and authorization.William Ray
$0.00
Draft  
 
Kuali Coeus Negotiations Module Implementation
12-01-2015 11:49:06Office of ResearchKuali Coeus Negotiations Module ImplementationMark Warner, Eric Taggart, Barbara Inderwiesche, Kim Frazer, David Tieu
$0.00
Closed CompletePhase 1 in production use. Phase 2 plans were cancelled by OR management. Any further changes will be made via maintance. 
 
KFS Decision Support - CAM Enhancements
12-01-2015 11:38:43Administrative and Business ServicesRedesign existing dimensional model, develop ETL and reporting for KFS Capital Asset Module subject area. 
If funding is available, Analytix DS will develop ETL. Estimated cost is $30,000
Marc Guerra, Valerie Jones
$0.00
PendingPrioritization is still needed for CAM data mart and workflow data marts. 
 
KFS Decision Support - PURAP, TEM and AR Enhancements
12-01-2015 11:37:27Administrative and Business ServicesDesign dimensional model, develop ETL and reporting for KFS Purchasing/Accounts Payable, Travel & Entertainment, and Accounts Receivable subject areas. 
AnalytixDS will be hired to develop ETL. Estimated cost is $60,000
Marc Guerra, Susan Moore, Melissa Green, Valerie Jones
$72,000.00
Work in ProgressFunctional specifications and report specifications development is in progress for accounts payable modules. Purchase order functional specifications are complete, and modeling has started. 
 
Office of Research Decision Support & Data Warehouse
12-01-2015 11:22:29Office of ResearchDevelop Office of Research data warehouse and reportsBruce Morgan, Valerie Jones, Austin Cho
$0.00
Work in ProgressAwaiting functional requirements. Development of operational data store and remediation of existing reports is complete and awaiting functional sign-off. 
 
UCPath Decision Support & Data Warehouse
12-01-2015 11:19:21Administrative and Business ServicesUCPath Decision Support and Data Warehouse implementation. Includes implementation for the Data Dissemination Operational Data Store (DDODS).Paul Sheirich, Valerie Jones
$0.00
Work in ProgressIn Progress 
 
Update OIR database servers
11-29-2015 17:11:41Office of Institutional ReserachOIR's database servers are exceeding their capacity. Deploy a new database server to replace FS.OIR, and begin the process of migrating OIR to campus data marts to replace FSB.OIR. Decommission FS.OIR and FSB.OIR. Note that replacing FS.OIR is a near-term solution; the long-term solution will be to migrate OIR entirely away from having their own siloed data.Larry Coon
$0.00
Work in ProgressWSG is working on new VMs, then will hand over to DBA group. 
 
Develop a local successor to EAB Student Success Collaborative
11-29-2015 16:35:49Office of Institutional Research (OIR), Dvision of Undergraduate Education (DUE)With the campus involvement in EAB Student Success Collaborative being discontinued, a successor needs to be developed. Develop Advisor tools, predictive risk analytics and institutional reporting for a successor product, and integrate with Banner SIS tools.Larry Coon
$233,000.00
PendingEarly discussions, finding candidate solutions. 
 
Develop a QBE-style front-end to support financial reporting
11-29-2015 15:59:22AccountingMarc Guerra reports that end users around campus would like a QBE-style ad-hoc tool for financial reporting similar to UCI's BLISS or UCR's UCRFStotals.Larry Coon
$0.00
PendingWaiting for Accounting to define requirements. 
 
Deliver Delaware Study data to OIR
11-29-2015 15:22:49OIROIR submits a large body of data annually to the University of Delaware for the National Study on Costs and Productivity (Delaware Study). Assemble and deliver this data to OIR to facilitate its submission.Larry Coon
$0.00
Work in ProgressData delivered for 2015 submission. Need to assemble data mart for future submissions & related analysis. 
 
Migrate OIR HR/Payroll data processing from PPS to UCPath
11-29-2015 15:09:49OIROIR retrieves monthly payroll commitment and actuals snapshots for internal processing, including Primary Appointments reporting. These processes must be adapted to use UCPath, including continued support of longitudinal reporting.Larry Coon
$0.00
Pending  
 
Pilot project for Budget Office financial forecasting using TM1
11-29-2015 10:44:08Budget OfficeDevelop a TM1 forecasting application to produce financial forecasts for the Budget Office based on the SRECNP (Statement of Revenues, Expenses and Changes in Net Position).Larry Coon
$0.00
PendingDeveloping statement of work/project plan with outside contractor. 
 
Virtualize OIR server hardware
11-29-2015 09:25:25OIRThe OIR database, file and development servers should be decommissioned and replaced with virtual equivalents. This includes the OIR firewall hardware.Larry Coon
$0.00
Closed CompleteFS, FSB, SS, SSB and DEV are complete, leaving only the firewall hardware. 
 
Implement campus student data mart
11-29-2015 09:17:34OIRGrow the OIR student data mart into one usable by the general campus. This student data mart should support the continuing access to legacy student data after Banner SIS goes live, as well as all required student data access while Banner SIS is in development.Larry Coon
$0.00
Pending  
 
OIR and DUE student data integration and reporting collaboration
11-29-2015 09:07:28OIR, DUEWork with Office of Institutional Research (OIR) and Division of Undergraduate Education (DUE) to identify commonalities in data acquisition, processing and reporting; work to align these processes and eliminate redundancies; work toward both offices utilizing a common student data martLarry Coon
$0.00
Work in ProgressDiscussions underway. 
 
KFS Decision Support - GL Enhancements
11-23-2015 13:44:45Accounting and Fiscal ServicesThe dimensional models for Kuali General Ledger data will be enhanced to allow historical (SCD type 2) and current ledger and balance reports for Account, Object and Organization dimensions. This will allow reports to display the dimensional attribute values as of the time the transaction was posted as well as display the current dimensional values for the transaction. 
AnalytixDS will be used as a contractor for the ETL development. Estimated cost: 60,000.00
Marc Guerra, Susan Moore, Melissa Green, Valerie Jones, Kevin Chung
$0.00
Work in ProgressFunctional specifications are complete and model design is in progress. The report developers are currently testing the proof-of-concept design. 
 
SQL Server Installation for Alerton Software Project
11-17-2015 13:47:07Facilities ManagementStill collecting information on the software requirements from Tom Vu. A single standard 2014 license was purchased but we need an additional license to cover the Microsoft requirements for a VM installation (4 cores). I also do not have any vendor software requirements as to what components of SQL Server need to be installed.Thomas Robbins
$2,000.00
Closed Complete  
 
Graduate Division - File Servers Replacement
11-09-2015 14:28:01Graduate DivisionReplace older EOL Windows 2003 Servers for Graduate Division file servers with two new file servers. One for data classification low risk, and one for data classification medium and high risk.Rachel Tam
$0.00
PendingNew file server requests drafted. Meeting with Aakash 1/26/2016 to discuss. 
 
Refactor and improve DSC faculty tools for alternative testing and notetaking accommodation
11-09-2015 14:06:22Disability Services CenterFor the Disability Services Center upgrade faculty tools for test taking and note takers. This will include more and improved feature as requested.Kevin Ansel
$0.00
Work in ProgressIn - progress 
 
Student Information System (SIS) for Graduate Division
11-03-2015 14:23:04Graduate Divisionhttps://uci.atlassian.net/wiki/x/NhhCAQ 

Implement the Ellucian Student Information System for Graduate Division
Rachel Tam
$0.00
Work in Progress-SIS GradAid see PRJ0012515 
-Admissions: Recruiter application configuration 
--Application configuration 
--Waiting on delivery of new Recruiter timeline in mid January 
--Recruiter 7 of 11 CRs submitted, discussion regarding 2 of 11 CRs scheduled 
-Enrolled 
--Revisiting "Cancelled not needed" DD2 requirements that are still needed
 
 
EA - Registrars Office IT - Top Security Items
11-03-2015 10:49:08Enrollment Serviceshttps://uci.atlassian.net/wiki/x/ICgOBJeffrey White
$0.00
Work in Progress  
 
EA - Undergraduate Admissions IT - Top Security Action Items
11-03-2015 10:37:35Enrollment Serviceshttps://uci.atlassian.net/wiki/x/HSgOBJeffrey White
$0.00
Work in Progress  
 10-31-2015 15:04:05Student Affairs, A&BS Carmen Roode
$0.00
Closed Withdrawn  
 
Facilities Management Upgrade platform and application 3.4.2 and 10.4.2 - FM
10-31-2015 14:11:34Facilities ManagementWe implemented IBM10 version 3.4.0 as per the contract with our vendor and are currently a release behind. We need to stay current with IBM10 releases in order to remain current with our licensing support contract.Jyoti Razdan, Stephanie-Jean Hinojosa
$0.00
Work in ProgressStarting to analyze the upgrade process. 
 
IBM10 Capital Projects Implementation - FM
10-31-2015 11:44:43Facilities ManagementUpgrade current Projects8i System to IBM10 Capital Projects system. This project will require a significant analysis phase before development can begin.Jyoti Razdan, Stephanie-Jean Hinojosa
$300,000.00
HoldAwaiting resources for the analysis phase. 
 
TouchNet Payment Plan
10-30-2015 16:54:01Central Cashier/Payment Processing Center Cecilia Do, Linda Sizemore
$0.00
Pending  
 
TouchNet eBill Presentment and eRefund
10-30-2015 16:53:14Central Cashier/Payment Processing Center Cecilia Do, Linda Sizemore
$0.00
Pending  
 
TouchNet Cashiering and Departmental Deposits
10-30-2015 16:52:27Central Cashier/Payment Processing CenterTouchNet Cashiering and Departmental Deposits (aka COD)Cecilia Do, Linda Sizemore
$0.00
Pending  
 
TouchNet Payment Center
10-30-2015 16:51:20Central Cashier/Payment Processing CenterTouchNet Payment Center using CAS (Central Authentication Services) for student to pay tuition and bills by credit card, debit card, and ACHCecilia Do, Linda Sizemore
$0.00
Pending  
 
TouchNet Marketplace
10-30-2015 16:49:53Central Cashier/Payment Processing CenterTouchNet Marketplace Implementation for uStore and uPay. Vendor-hosted solution for shopping cart and credit card processing.Cecilia Do, Linda Sizemore
$0.00
Work in ProgressWorking with departments to migrate off of CCCS, as credit card processing piece will be decommissioned at end of January. 

Providing continued support for pilot groups.
 
 
Financial Interfaces - Migration Of ABACUS To MS SQL Server And Powerbuilder 11.5
10-30-2015 15:07:05University AdvancementMigration of University Advancement's ABACUS system from Sybase database to MS SQL Server as well as migrating to Powerbuilder 11.5.Modesto Sevilla
$0.00
Closed Complete  
 
Implement UPS iShip to KFS integration
10-30-2015 14:52:24UCOP/Purchasing Warren Liang, Brant Yancey
$75,000.00
PendingDuplicate of PRJ0012370 
 
Increase UCIMC usage of KFS system
10-30-2015 14:48:22UCIMC Warren Liang, Marc Guerra
$0.00
Work in Progress  
 
1042S file submission
10-29-2015 15:41:39A&FS Warren Liang, Karen Miller
$0.00
Work in Progress  
 
Implement Payroll Certification Module within KFS
10-29-2015 15:34:24C&G Accounting Warren Liang, Rebecca Tangen
$150,000.00
Pending  
 
GD Operations Activities 2015
10-29-2015 09:54:44Graduate Divisionhttps://uci.atlassian.net/wiki/display/gdorit/GD+-+Info+Sys+Operations+ActivitiesRachel Tam
$0.00
Closed CompleteCompleted at end of 2015 
 10-28-2015 13:37:43Transportation & Distribution ServicesProject to track replacement efforts for the bike.uci.edu web infrastructure. May also include revamp of website layout and flow.Ronald Fleming, Julianna Bayley, Erika Hennon, Clint Maruki, Jeffrey White
$0.00
Closed CompleteIn progress, on schedule. Initial migration of bike site content to UCI Sites has been complete. Pending internal IT and Communications team review on 11/13 before proceeding to deployment. 
 
Upgrade Bookstore PCI compliance 2.0 to 3.0
10-27-2015 11:41:34Student Affairs IT Kevin Ansel
$0.00
Closed CompleteCompleted 
 
EA - Graduate Division IT - Top Security Action Items
10-13-2015 14:16:58Graduate Divisionhttps://uci.atlassian.net/wiki/x/FigOBRachel Tam, Courtney Crowther
$0.00
Work in Progress7/12 of the numbered items are completed. 

Next focus: public vs non-public sites and password rotations.
 
 
Office Of Research Applications Disaster Recovery (Kuali Coeus)
10-12-2015 10:22:38Office of ResearchThis project will handle planning and support of all the disaster recovery related activities for all OIT supported OR ApplicationsCarmen Roode, David Tieu, Barbara Inderwiesche, Rajnish Sinha
$0.00
Work in ProgressPlanning to create documents for application specific tasks in the DR plan. 
 
Office of Research Client SLA creation
10-12-2015 09:40:46Office of ResearchThis project is to create a OR Client SLARajnish Sinha
$0.00
Work in ProgressDrafted. Needs refinement and review with OR management. 
 
Implement a Mobile Solution (FieldFlex) integrated with the New Facilities Management - FM
10-09-2015 15:53:26Facilities ManagementAs a Phase 2 implementation of IBM Tririga 10, Facilities Management will implement an integrated mobile solution. 
Use of Mobility is intended to: 
•Keeping technicians working in the field - Mobility 
•Increase efficiencies through work process improvements 
High level requirements include: 
•View / sort a list of work tasks assigned to technician; 
•Update details of work task 
•Enter time against work tasks 
•Enter none labor hours 
•Request and receive parts and materials 
•Attach documents and pictures 
Additional information is available or will be available on the FM OIT WIki. 
Jyoti Razdan, Stephanie-Jean Hinojosa
$0.00
Hold  
 
Replace Facilities Management iPool System
10-05-2015 15:33:31Facilities ManagementiPool is vendor software for Fleet Services. This software manages rentals, reservations, and the charges of various kinds related to vehicles. iPool is supported by a one-man shop and we do not have the code for the system. We should consider if IBM 10 can be used/customized to serve Fleet Services. If not, we should consider another vendor solution.Jyoti Razdan, Stephanie-Jean Hinojosa
$0.00
Work in ProgressAwaiting resources to assist with analysis. 
 
SIS GradAid
09-22-2015 09:48:12Graduate Divisionhttps://uci.atlassian.net/wiki/display/SIS/SIS+GradAid+-+Project+Proposal#SISGradAid-ProjectProposal-ConciseProjectDescriptionFrances Leslie, Courtney Crowther, Mei-Lien Young, Katya Sadovsky, Ruth Quinnan, Rachel Tam
$0.00
Work in ProgressFinalizing functional requirements for final SMEs approval. Mockups for UIs started. Data model design. Integrations with Banner. 
 
Middleware - Cognos 10.2.2 Upgrade
09-18-2015 15:36:37Office of Institutional ResearchUpgrade to Cognos 10.2.2 using a parallel environment.Mathew Wilson
$0.00
Closed Complete  
 
TDS COUNT system
09-17-2015 16:18:19Transportation and Distribution ServicesThe COUNT project is an automated vehicle counting system that will improve operational efficiencies during parking utilization studies using wireless vehicle sensors, data collection hardware and a software data management program.Ronald Fleming, Clint Maruki, Sheila Nguyen, Lynn Harris, Matthew Lorenzo
$0.00
Closed CompleteFive ultrasonic sensors are installed in SCPS, configured, and actively collecting vehicle count data. (Since 11/19) 
 
Migrate Laserfiche Databases to Decon-DB01
09-14-2015 09:10:12D&CSIn order to further consolidate database servers in D&CS to simplify backup and server management, databases from laserfiche.decon.uci.edu will be migrated to decon-db01.decon.uci.edu.Thomas Robbins
$0.00
Closed Complete  
 
WHCS - Student Health Psych PNC Survey
08-28-2015 08:48:04WHCS Student Health PsychStudent Fills Out 
PHQ 9 Patient Health Questionnaire 9 
GAD 7 Generalized Anxiety Disorder 7 
AUDIT Alcohol Use Disorders Identification Test 
MDQ Mood Disorder Questionnaire 
PC-PTSD Primary Care PTSD Screen 
EAT Eating Attitudes Test 

Provider Fills Out 
MoCA Montreal Cognitive Assessment 
AIMS Abnormal Involuntary Movement Scale 
BARS Barnes Akathisia Rating Scale 
YBOCS v2 Yale-Brown Obsessive Compulsive Scale 
YMRS Young Mania Rating Scales 
LSAS Liebowitz Social Anxiety Scale 
CAPS PTSD for DSM 5: Clinician Administered PTSD Scale for DSM 5 
IDTS-drugs/Alcohol: Inventory of Drug Taking Scenarios
Herbert Chan
$0.00
Closed CompleteAwaiting stakeholder's approval for AUDIT survey. E-mail inquiry was sent out last week. Awaiting response. 
 
Reset Voicemail
08-18-2015 13:18:52COUNSELING CENTERReset voicemail for office 201D, extension 45397 located in the Counseling Center.Laura Cardona
$0.00
Draft  
 
TouchNet: Market Place for eCommerce activities
08-13-2015 17:00:27Central Cashier/Payment Processing CenterTouchNet Market Place provides uStore and uPay for individual department to create single store, shopping mall, event registration, and fund raising. The user can connect home-grown store-front to TouchNet uPay site and receive post-back for authorized cc sales in real-time while uStore order confirmation can be configured to be equal to authorized cc sales. 

Please view the functional requirements document at https://uci.atlassian.net/wiki/x/1vsNB
Linda Sizemore, I-Rong Lin, Lindsay Carroll, Isaac Straley, Dianne Bean, Cecilia Do
$0.00
Work in ProgressThis project is 90% completed. We schedule to decomission CCCS credit card sales function by 1/29/2016. This project implementation is on target on schedule with our phase-in approach. 
 
Adding UCI ID Card data to Shibboleth (/IDM)
07-16-2015 10:41:35School of LawThe School of Law is purchasing a printing solution ( https://www.wepanow.com/ ) that can use Shibboleth to let users log into an account where they can add credits to their UCI ID card for use at their printing stations. 

Shibboleth needs to return the UCI ID Card number to tie to the user's account. This ID number is not currently returned by Shibboleth and an integration will be needed.
Dana Watanabe
$0.00
Draft  
 
Middleware - Move Webmail to F5
07-10-2015 07:25:55EUSWe are retiring ServerIron and move Webmail to F5Brian Craft
$0.00
Hold  
 
Middleware - Moving EEE from ServerIron to F5
07-10-2015 07:25:08AWTWe are retiring ServerIron and move EEE to F5Brian Craft
$0.00
Work in ProgressSubnet allocated 
 
Testing Project Submission
07-09-2015 15:00:13Facilities ManagementTesting to see how this project submissions system worksJenifer Swann
$0.00
Draft  
 
Middleware -Moving F5 and Sun Solaris box from Science Lib DC to Central Plant
07-06-2015 17:55:04Francisco Lopez, Jason LinThis project is to move F5 and Sun Solaris box from Science Library DC to Central Plant. This will help to minimize down time due to a power outage since Central Plant has UPS and power generator. This will bring the F5 close to KFS service backup equipment that might help us to stay up with critical functionality and flexibility to route traffic during an OITDC power outage. This will include an upgrade of network devices for 10Gb network connectivity in Central Plant to accommodate future growth. This project will also help to relocate the firewall from OITDC to Central Plant. 

(Detail is in the file attachment)
Jason Lin
$0.00
Closed WithdrawnHolding pattern for resolution to our current fiber situation 
 
Prepare OIT Facts web page for 2014 Spring quarter
07-06-2015 17:55:03Help DeskVarious groups in OIT need to be polled for data so an April - June 2015 stats web page can be createdCheryl Watt, Robert Hudack
$0.00
Closed Complete  
 
FDX Migration to UCI
07-06-2015 17:55:03Budget Office - Capital Planning and Space ManagementUpdate - 9/2/2015 - still awaiting word from LogicDomain on test server verification and finalization. Action is suspended until feedback received. 
Update 11/2015 - still awaiting LogicDomain availability for final testing and production turnover. Maintaining servers in meantime.
Janet Mason, Gina Adams, Clint Maruki
$0.00
HoldStill awaiting full testing by LogicDomain on test server. Initial tests were successful and infrastructure is 98% production ready. 
 
EA/SfinSvcs: Affordable Care Act reporting requirement, mandate by IRS section 6055
07-06-2015 17:55:03Student HealthSection 6055 was added to the IRS code as required by the Affordable Care Act. This provision mandates that, effective in early 2016 for coverage provided in 2015, providers of minimum essential health insurance coverage must report information regarding covered individuals to the IRS including SSN's. Below, for your reference, is a link to the relevant page of the IRS website: 

http://www.irs.gov/Affordable-Care-Act/Questions-and-Answers-on-Information-Reporting-by-Health-Coverage-Providers-Section-6055 

This requirement pertains to UCI's graduate students who are covered by the University of California's self-funded UC SHIP plan (GSHIP) and to UCI's undergraduate students who are covered by its fully-insured plan (USHIP).
Charles Adams, Nasim Mohebbi, I-Rong Lin
$0.00
Closed CompleteACA reporting requirement project was successfully implemented in December, 2015 before winter recess. 
 
EA/SfinSvcs: Non-resident Tuition Waiver for Non-resident Veterans and Their Family
07-06-2015 17:55:02Registrar, Vet Services Office, Accounting/Financial ServicesIn compliance with Section 702 of the VACAA, UC will begin issuing a new nonresident tuition benefit for eligible veterans and their dependents starting July 1, 2015. I've attached some information on this new military benefit below from Nancy Coolidge at UCOP that was previously sent to VA certifying officials and Registrars. The new benefit was signed into law last summer and gave public universities until July 1, 2015 to comply. 

Students eligible for Section 702 will receive a waiver of all nonresident tuition, despite their nonresident status. 

The following categories will need their own separate waivers to correspond with their respective nonresident tuition amounts: a) undergrad, b) grad c) professional school students and d) law students.
John Lapuz, I-Rong Lin, Linda Sizemore, Tu Dang, Nasim Mohebbi
$0.00
Closed CompleteSince UC Irvine Enrollment Services does not keep track of student's family members in computer application systems, Registrar, Financial Services, and campus VA office jointly determined the issuing for non-resident tuition waiver for veteran's family member would be handled manually without flowing through student information system. This project was regarded as completed based on the above described solution. 
 
Facilities Management EnergyCAP Software
07-06-2015 17:55:02Facilities ManagementThis project is in response to a UCOP mandate to utilize EnergyCAP software to track vendor utility bills with the added benefit of more streamlined billing process.Jyoti Razdan
$0.00
Closed Withdrawn  
 
Enrollment Services server migration to new hardware
07-06-2015 17:55:01Enrollment ServicesRearchitect and migration of Admissions and Registrar servers to new virtual environment hardware. Migration of standalone servers to the new hardware as well. Existing virtual hardware will be used for redundancy and fail-over for migrated servers.Lewis Chiang, Carmen Roode
$0.00
Closed Complete7 servers remain to be migrated 
 
Spend Analytics
07-06-2015 17:55:01Purchasing Valerie Jones
$0.00
Closed Complete  
 
Student Information System (SIS)
07-06-2015 17:55:01Enrollment Services Steve Noh, Christopher Shultz
$0.00
Work in Progress  
 
KFS Refinement and Support - 2015/16
07-06-2015 17:55:01A&BS/Budget Office Marc Guerra, Keiko Takahashi, Warren Liang
$0.00
Work in Progress  
 
Facilities Renovation Report
07-06-2015 17:55:00Facilities Management - Budget & Finance Jyoti Razdan, Durendal Huynh
$0.00
Closed Complete  
 
IBM 10 Implementation; Preventative Maintenance & Maintenance Plans
07-06-2015 17:55:00Facilities Management Jyoti Razdan
$0.00
Closed CompleteProject completed. 
 
FM Timesheet (and interfaces with IBM 9 and 10)
07-06-2015 17:55:00Facilities Management Jyoti Razdan
$0.00
Closed Complete  
 
FacNet Audit
07-06-2015 17:55:00Facilities Management Sarkis Daglian, Stephanie-Jean Hinojosa
$0.00
Work in Progress  
 
Guest Permit System Project
07-06-2015 17:55:00Transportation & Distribution ServicesProject launch date/end date has been moved (several times) due to additional requirements changes requested by the business users, or adjustment in direction of the project stated goals.Ronald Fleming, Nancy Lu, Sheila Nguyen, Jeffrey White, Clint Maruki
$0.00
Closed CompleteGPS has been launched, monitored, and deemed stable in production. 
 
inField (parking mobility solution)
07-06-2015 17:55:00Transportation & Distribution ServicesClosing project as all tasks have been completed.Ronald Fleming, Dina Ochoa, Juan Rodriguez, Clint Maruki, Matthew Lorenzo, Jeffrey White
$0.00
Closed CompleteProject post-support completed. Project is closed and system is now active and in standard support. 
 
Filenet Implementation
07-06-2015 17:55:00eDocs Linh Nguyen
$0.00
Work in Progress  
 
Filenet Case Management Widget/Dojo Implementation for Budget Office
07-06-2015 17:55:00eDocsThis project involved scanning about 20 boxes of Budget Office forms and creating an Filenet repository that will be populated by documents that are arriving via email and other channels into the Budget Office.Linh Nguyen
$0.00
Work in Progress  
 07-06-2015 17:55:00HR/Payroll Roberta Nardico, Ying Kussmann
$0.00
Work in Progress  
 
Graduate Alumni Support Services
07-06-2015 17:54:59Graduate DivisionGraduate Alumni Support ServicesFrances Leslie, Rachel Tam, Raslyn Rendon
$0.00
HoldGD staff pursuing options with BridgeMedia and iModules 
 
Kuali Coeus and Cayuse 424 System to System Integration
07-06-2015 17:54:58Office of ResearchKuali Coeus and Cayuse 424 System to System Integration. Phase 1 was put into production around April 2015. Phase 2 is under development and involves integrating data between KC and Cayuse. Phase 2 will be conducted in pieces with some dependencies on Evisions changes due around March 2016Bruce Morgan, Ryan Lam, Barbara Inderwiesche, Alison Yeung, Noah Margolis, Jonathan Lew, David Tieu
$0.00
Work in ProgressThe cayuse client library is complete as far as the web services operations we'll be using on KC PD. The main activities involve pairing and updating permissions on cayuse with users listed in KC PD. 
 
Replace ULAR TRS with UCI TRS
07-06-2015 17:54:58Office of ResearchReplace ULAR TRS with UCI TRSJeffrey Goodwin, David Tieu, Jefferson Chau, Rajnish Sinha, Soo Lee
$0.00
DraftHave initiated contacts with vendor for time recorder. Vendors have not responded yet. Will also contact Angela Han for more information regarding Food Services' implementation and possibly their day to day process. 
 
Streamlining IRB Unanticipated Problem Reporting
07-06-2015 17:54:58Office of ResearchStreamlining IRB Unanticipated Problem ReportingKaren Allen, Beverley Alberola, Rajnish Sinha
$0.00
Work in ProgressDevelopment to address User feedback from the December beta is underway. Feedback for the HPS changes have been addressed, and feedback for the FARS component is in progress. 
 
2015 IRB Application Enhancements for AAHRPP Accreditation
07-06-2015 17:54:58Office of Research2015 IRB Application Enhancements for AAHRPP AccreditationKaren Allen, Beverley Alberola, Rajnish Sinha, Jessica Sheldon
$0.00
Work in ProgressAdding docs is pending. Rest development and part user verification completed 
 
Kuali Coeus - Award Module Implementation Analysis
07-06-2015 17:54:58Office of ResearchKuali Coeus - Award Module Implementation AnalysisBruce Morgan, Alison Yeung, David Tieu, Barbara Inderwiesche
$0.00
Work in ProgressNo change in status from last week. Alison is continuing to work on analysis of module and conducting interviews with OR management. 
 
Fall 2016 Graduate Admission Cycle Changes
07-06-2015 17:54:58Graduate DivisionFall 2016 Graduate Admission Cycle Changes 

See JIRA https://services.adcom.uci.edu/jira/browse/GDMAINTADM-644
Frances Leslie, Ruth Quinnan, Mei-Lien Young, Rachel Tam, Joanna Itoh
$0.00
Closed Complete  
 
Kuali Coeus Conflict of Interest Module Implementation
07-06-2015 17:54:58Office of ResearchKuali Coeus Conflict of Interest Module ImplementationNancy Lewis, Noah Margolis, Barbara Inderwiesche, Kim Frazer, David Tieu, Nadia Wong, Jonathan Lew
$0.00
Work in ProgressContinued development work on Annual disclosure, notifications and data transfers to COI/SPA database. 
 
EH&S LAOHP Administration System Workflow Enhancements
07-06-2015 17:54:57Environmental Health & SafetyEH&S LAOHP Administration System Workflow EnhancementsEric Taggart, Karla Hill
$0.00
Work in ProgressAdded initial Decline Form - need to configure workflow. Manzi finalizing verbiage changes - waiting on Karla for more. 
 
Design and Develop the New Research Administration Data Warehouse
07-06-2015 17:54:57Office of ResearchResearch Administration Data WarehouseRajnish Sinha
$0.00
Work in ProgressPhase 1 capabilities are undergoing final user acceptance testing. Phase 2 capabilities are being developed. 
 
iMedRIS Vendor Hosted Services of iRIS for IBC Administration
07-06-2015 17:54:57Environmental Health & SafetyiMedRIS vendor hosted services for iRIS and database migration from campus hosted system to vendor hosted environment 

Migrate the iMedRIS (iRIS) IBC Administration application from a campus hosted environment to a vendor hosted environment managed by iMedRIS. Migrate existing Institutional Biosafety Committee (IBC) protocol data from the UCI hosted environment to the vendor hosted environment. Upgrade to the newest version of the iMedRIS iRIS software for IBC administration. Decommission the UCI servers formerly used for running the system. Develop and implement method to automate twice daily sending of data from the vendor hosted environment to Office of Research hosted system.
Jenifer Swann, Noah Margolis, Sheila Redjai, Alice Lee
$0.00
Work in ProgressService agreement is signed by all parties and Data Security controls are deemed sufficient. Starting weekly status meeting with vendor to closely track technical work that is about to start. 
 
Adding Students to Fileshare
07-06-2015 11:00:39Cross-Cultural CenterI would like to add the following names and ucinet id's to the SLL --> CCC fileshare: 

Leticia Cruz leticic1@uci.edu 
Jenny Tseng tsengj2@uci.edu 
Kara Rivera karar@uci.edu 
Michelle Yang yangwl@uci.edu 
Janani Venkateswaran jvenkate@uci.edu 
Monica Serrano mrserran@uci.edu 
Patsy Morales patsym@uci.edu 
Susan Phommasak Sphommas@uci.edu 
Jennifer Lima Jlima1@uci.edu 
Saul Avelleira savellei@uci.edu 
Caroline Truong carolict@uci.edu 
Cheryl Flores crflores@uci.edu 
Naty Rico ricon@uci.edu 
Melanie Fernandez melaniaf@uci.edu 


Alicia Aguayo aguayoa1@uci.edu 
Valerie Sanchez valeris@uci.edu 
Priscilla Perez perezpi@uci.edu 
Sandy Lee sandyl9@uci.edu 
Roxana Ayala roxanaa@uci.edu 
Denice Velez
$0.00
Closed Withdrawn  
 
Kuali Coeus Negotiations Module Phase 1
05-21-2015 13:00:00Office of ResearchCustomize negotiations module in KC for use within SPA - phase 1. 
Design and analysis, weekly working group. 
Technical work is beginning with setting up an svn branch, new tomcat web servers for testing and UAT and documenting agreed customizations.
Noah Margolis
$0.00
Closed Completeclosed out JIRA project. 
 
QuickTemp Rewrite
03-17-2015 12:27:11Human ResourcesProject have 3 main objectives: 
1. Convert Quicktemp to interface with UCPath 
2. Decommission the timesheet component and build integration with TRS. 
3. Technology refresh to rewrite the application using Spring framework.
Steven Johnson, Ying Kussmann
$0.00
Work in Progress  
 
Improve the LAOHP Questionnaire to Meet New EH&S Requirements
03-03-2015 07:38:39Environmental Health & Safety Rajnish Sinha
$0.00
Closed Complete  
 
Tick@Lab Contract Negotiations
02-26-2015 14:20:46Office of ResearchWork with ULAR, UCI Materiel and Risk Management and A-Tune Software to negotiate and finalize the Tick@Lab software contract including licensing costs and professional services.Eric Taggart
$0.00
Closed Complete  
 
Courseleaf CIM to Registrar SIS interface
02-25-2015 19:00:34Enrollent ServicesThe Registrar's Office has purchased and implemented the CourseLeaf Curriculum (CIM) system from a vendor called Leepfrog (http://www.leepfrog.com/courseleaf/curriculum/). This online workflow system is used to manage all the courses that are offered at UCI. New courses and changes to existing courses must be submitted into the system and approved by various groups on campus before it can be taught. For example, courses must be approved by the department offering the course, the Registrar's Office, and the Academic Senate. 

The previous course curriculum system, CASPER, is an old vendor application written in a language called AREV and it currently runs from Windows 95 VMs on Registrar staff PCs. The system did not have a workflow component; all course approvals were previously handled through a paper process and then manually entered into CASPER by the Registrar staff. Once courses were entered into Casper, a "drainer" program running on a Windows 95 PC would export the data and write it into the Cobol MUCK file. The MUCK file is the master course file used by the Registrar SIS. 

Currently, Registrar staff still manually enter course data into CASPER. Instead of going off of paper forms, they pull up the data online from CIM. Leepfrog has created a data feed that contains all currently approved courses in the CIM system. We need to create an interface to take the daily text file and load the course information to the MUCK file.
Joshua Jackson
$0.00
HoldProject on hold due to significant data inconsisencies coming from CIM. We cannot import to Legacy SIS with the current data. Exploring other options. 
 
Tick@Lab Animal Research Administration System Implementation
02-25-2015 08:22:17Office of ResearchImplementation of the Tick@Lab animal research administration system from A-Tune Software to replace numerous legacy in-house-developed OR IT applications.Mark Warner, Eric Taggart, Jeffrey Goodwin, Da Lu, Rajnish Sinha, Melanie Fabian
$155,000.00
Work in ProgressPhase 1 IACUC Protocol configurations and base setup completed. User acceptance testing in progress. System interfaces development completed. Targeting February 2016 go live. Investigating IACUC Agendas for Phase 1. 
 
Financial Aid - Consolidate all backups to a single solution
11-18-2014 11:41:46Enrollment ServicesConsolidate all backups to a single solution. Backups for servers within Financial aid are split (some using Backup exec to local backup server \ some using Networker for backups).Sheng-Lun Huang
$0.00
Pending  

 

  • Project Archives - Information on projects opened, managed, or completed prior to 2014.