UCIMI Gantt Chart
UCIMI Gantt Chart
MILESTONE
Update 2019
Gantt Chart (downloadable version by request)
| Decision point | |||||||||||||||||||||||
PI: James | Milestone | Project Start date | 4/1/17 | 4/1/18 | 4/1/19 | 4/1/20 | 4/1/21 | |||||||||||||||||
Milestone or Decision Point | Group | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||||||||
Specific Aim | Activity | 6/30/17 | 9/1/2017 | 12/1/2017 | 3/1/2018 | 6/1/2018 | 9/1/2018 | 12/1/2018 | 3/1/2019 | 6/1/2019 | 9/1/2019 | 12/1/2019 | 3/1/2020 | 6/1/2020 | 9/1/2020 | 12/1/2020 | 3/1/2021 | 6/1/2021 | 9/1/2021 | 12/1/2021 | 3/1/2022 | |||
Objective 1: Project Administration | ||||||||||||||||||||||||
1. Recruit Project Personnel | 1. Write Job Description/announcements | 1.1.1 | UCI | 1.1.1a | ||||||||||||||||||||
2. Advertise positions | 1.1.2 | UCI | 1.1.2a | |||||||||||||||||||||
3. Interview Candidates | 1.1.3 | UCI | 1.1.3a | |||||||||||||||||||||
4. Fill positions | 1.1.4 | UCI | 1.1.4a | |||||||||||||||||||||
2. Develop comprehensive Project Plan | 1. Develop draft project plan | 1.2.1 | UCI | 1.2.1a | 1.2.1b | 1.2.1c | 1.2.1d | |||||||||||||||||
3. Develop decision-making protocol | 1. Develop decision making protocol | 1.3.1 | UCI | 1.3.1a | 1.3.1a | |||||||||||||||||||
4. Develop communications strategy | 1. Reactive plan | 1.4.1 | All | 1.4.1a | 1.4.1b | 1.4.1b | 1.4.1c | 1.4.1d | ||||||||||||||||
2. Proactive plan | All | 1.4.2a | 1.4.2b | 1.4.1b | 1.4.1c | 1.4.1d | ||||||||||||||||||
5. Develop central web portal | 1. Develop central website | 1.5.1 | UCI | 1.5.1a | 1.5.1b | |||||||||||||||||||
2. Update website (ongoing process) | 1.5.2 | UCI | 1.5.2a | 1.5.2b | 1.5.2c | 1.5.2d | 1.5.2e | 1.5.2f | 1.5.2g | 1.5.2h | 1.5.2i | |||||||||||||
6. Develop regulatory plan | 1. Implement procedures for tracking research-related regulatory requirements (IBC, IACUC, CDC, USDA, others) | 1.6.1 | All | 1.6.1a | 1.6.1b | 1.6.1c | 1.6.1d | 1.6.1e | 1.6.1f | 1.6.1g | 1.6.1h | |||||||||||||
2.Review and develop knowledge base for regulatory requirements for potential field sites (see 4.2.4) | 1.6.2 | UCI, UCD | 1.6.2a | 1.6.2b | 1.6.2c | 1.6.2d | 1.6.2e | 1.6.2f | 1.6.2g | 1.6.2h | ||||||||||||||
3. Work with field team to obtain necessary permits and regulatory approvals for sample collection and site establishment. (see 4.2.4) | 1.6.3 | UCI, UCD | 1.6.3a | 1.6.3b | 1.6.3c | 1.6.3d | 1.6.3e | 1.6.3f | 1.6.3g | 1.6.3h | 1.6.3i | |||||||||||||
4. Hire Community Engagement consultant, begin permitting and regulatory analysis. Hire regulatory Consultant | 1.6.4a-b | 1.6.4a | 1.6.4b | |||||||||||||||||||||
7. Annual meeting of project participants | 1. Host annual meeting | 1.7.1 | UCI | 1.7.1a | 1/31/2019 | 1.7.1b | 1.7.1c | 1.7.1d | 1.7.1f | |||||||||||||||
Objective 2: Develop and test Anopheles gambiae strains carrying autonomous gene-drive systems linked to anti-pathogen effector genes. | ||||||||||||||||||||||||
1. Recruit Project Personnel | 1. Write Job Description/announcements | 2.1.1 | UCI, UCSD | 2.1.1a | ||||||||||||||||||||
2. Advertise positions | 2.1.2 | UCI, UCSD | 2.1.2a | |||||||||||||||||||||
3. Interview Candidates | 2.1.3 | UCI, UCSD | 2.1.3a | |||||||||||||||||||||
4. Fill positions | 2.1.4 | UCI, UCSD | 2.1.4a | |||||||||||||||||||||
2. Develop CRISPR/Cas9 gene-drive systems for Anopheles gambiae | 1. Identify and clone appropriate promoter sequences (for example, β2-tubulin, U6, vitellogenin, carboxypeptidase, G12) for expressing CRISPR/Cas9 gene-drive system components | 2.2.1 | UCI, UCSD | 2.2.1a | ||||||||||||||||||||
2. Identify An. gambiae fitness-neutral mosquito chromosomal loci, chromosomal loci conferring decreased mosquito fitness, and chromosomal loci that affect parasite propagation in the vector | 2.2.2 | UCI, UCSD | 2.2.2a | |||||||||||||||||||||
3. Design and synthesize gene-drive constructs, and verify sequence | 2.2.3 | UCI, UCSD | 2.2.3b | 2.2.3c | ||||||||||||||||||||
3. Engineer additional anti-parasite effector genes | 1. Develop additional single-chain (scFv) immunological reagents to inactivate P. falciparum (Pfs47 with Barrillas-Mury, NIH; Pfs230 with Narum, NIH; Ashley Birkett, PATH) | 2.3.1 | UCI, UCSD | 2.3.1a | 2.3.1b | 2.3.1c | Moved to Specific Aim 7 | |||||||||||||||||
3. Make An. gambiae transgenic lines to test additional effector genes using transposon-mediated transgenesis | 2.3.2 | UCI, UCSD | 2.3.3a | 2.3.3b | 2.3.3c | Moved to Specific Aim 7 | ||||||||||||||||||
4. Perform challenge assays with P. falciparum to determine efficacy of novel effector constructs | 2.3.3 | UCI, UCSD | 2.3.4a | 2.3.4b | 2.3.4c | Moved to Specific Aim 7 | ||||||||||||||||||
4. Generate transgenic mosquitoes carrying gene-drive elements and the parasite- resistance genes. | 1. Engineer effector cassettes with multiple molecules targeting different stages of the parasites. | 2.4.1 | UCI, UCSD | 2.4.1a | 2.4.1b | 2.4.1c | 2.4.1d | 2.4.1e | 2.4.1f | 2.4.1g | 2.4.1h | 2.4.1i | ||||||||||||
2. Perform ‘swap’ experiments to integrate effector molecules into the AgNosCd-1 gene-drive line. | 2.4.2 | 2.4.2a | 2.4.2b | |||||||||||||||||||||
5. Develop and maintain detailed laboratory standard operating procedures, experimental records, budgets, and provide reports to appropriate components of the administrative core | 1. Aim establishes and maintains the laboratory documents to validate strain development and other standard operating procedures. | 2.5.1 | UCI, UCSD, UCD | 2.5.1a | 2.5.1b | 2.5.1c | 2.5.1d | 2.5.1e | 2.5.1f | 2.5.1g | 2.5.1h | 2.5.1i | ||||||||||||
6. Test the gene-drive performance characteristics of the AgNOSCd-1 strain with no included effector molecules. | 1. Conduct small cage trials with first gene-drive line (nanos, cardinal). Drive features of the AgNOSCd-1 strain tested in small cage trials. | 2.6.1 | UCI, UCSD | 2.6.1a | 2.6.1 | 2.6.1a | ||||||||||||||||||
2. Develop method for accurately measuring NHEJ rate | 2.6.2 | UCI | 2.6.2a | 2.6.2 | ||||||||||||||||||||
3. Assay in vitro the effects of gRNA single nucleotide polymorphisms on Cas9-gRNA nuclease activity. | 2.6.3 | UCB, UCI, UCSD | 2.6.3a | |||||||||||||||||||||
4. Assay in vivo the effects of gRNA single nucleotide polymorphisms on Cas9-gRNA nuclease activity (Field sample dependent) | 2.6.4 | All | 2.6.4a | 2.6.4b | ||||||||||||||||||||
5. Determine life-table parameters of the AgNosCd-1 strain using fitness components | 2.6.5 | UCB, UCI, UCSD | 2.6.5a | |||||||||||||||||||||
6. Refine life-table parameter estimates of AgNosCd-1 strain using cage trial data | 2.6.6 | UCB, UCI, UCSD | 2.6.6a | 2.6.6b | 2.6.6c | 2.6.6d | 2.6.6e | |||||||||||||||||
7. Use fitted model of gene drive system and its effects on An. gambiae life-table parameters to predict behavior of system in the environment. | 2.6.7 | UCB, UCI, UCSD | 2.6.7a | 2.6.7b | 2.6.7c | 2.6.7d | 2.6.7e | 2.6.7f | 2.6.7g | 2.6.7h | 2.6.7i | 2.6.7j | 2.6.7k | 2.6.7l | 2.6.7m | |||||||||
7. Test the gene-drive performance characteristics of the AgNOSCd-1 strain with included effector molecules. | 1. Conduct small cage trials with first gene-drive line (nanos, cardinal). | 2.7.1 | 2.7.1a | 2.7.1b | 2.7.1c | |||||||||||||||||||
2. Refine life-table parameter estimates of AgNosCde-1 strain using cage trial data | 2.7.2 | 2.7.2a | 2.7.2b | 2.7.2c | ||||||||||||||||||||
3. Use fitted model of gene drive system and its effects on An. gambiae life-table parameters to predict behavior of system in the environment | 2.7.3 | 2.7.3a | ||||||||||||||||||||||
8.Test the effector performance characteristics of the strains | 1. Conduct parasite challenge assays on transgenic An. gambiae lines | 2.8.1 | 2.8.1a | 2.8.1b | 2.8.1c | 2.8.1d | 2.8.1e | |||||||||||||||||
9. Mathematical modeling to support target product profile recommendation | 1. Develop an epidemiological module for the MGDrivE modeling framework | 2.9.1 | 2.9.1 | |||||||||||||||||||||
2. Mathematical modeling to support target product profile recommendation | 2.9.2 | 2.9.2 | ||||||||||||||||||||||
10. Make recommendation for release strain | 1. Recommend a specific TPP for release | 2.10.1 | 2.9.1a | |||||||||||||||||||||
2 Initiate TPP specific Risk Assessment | 2.10.2 | 2.9.2a | ||||||||||||||||||||||
11. Develop target product profile for recommended strains | 1.Work with FNIH and other non-UCI MI projects to develop consensus on TPP parameters and develop values for ‘ideal’ and ‘minimally acceptable’. | 2.11.1 | 2.11.1a | |||||||||||||||||||||
2. Adopt consensus TPP parameters for ‘ideal’ and ‘minimally acceptable’ and assure AgNosCd-1 fits profile. | 2.11.2 | 2.11.2a | ||||||||||||||||||||||
3. Report TPP and test results to WHO Vector Control Advisory Group (VCAG) | 2.11.3 | 2.11.3a | ||||||||||||||||||||||
12. Perform risk assessment for recommended strain | 1. Work with field site to identify regulatory structure of the proposed field site | 2.12.1 | All | 2.12.1a | 2.12.1b | |||||||||||||||||||
2. Identify credible independent entity to conduct site-relevant risk assessment. | 2.12.2 | All | 2.12.2a | 2.12.2b | ||||||||||||||||||||
3. Conduct site-relevant risk assessment of product | 2.12.3 | All | 2.12.3b | |||||||||||||||||||||
Objective 3: Evaluate field site(s) for population alteration trials | ||||||||||||||||||||||||
1. Recruit Project Personnel | 1. Write Job Description/announcements | 3.1.1 | UCD, UCB, UCLA | 3.1.1a | ||||||||||||||||||||
2. Advertise positions | 3.1.2 | UCD | 3.1.2a | |||||||||||||||||||||
3. Interview Candidates | 3.1.3 | UCD | 3.1.3a | |||||||||||||||||||||
4. Fill positions. | 3.1.4 | UCD | 3.1.4a | |||||||||||||||||||||
2. Evaluation of Potential Field Sites for Selection of Four Candidate Sites | 1. Literature survey for the evaluation of 13 potential GEM field trial sites | 3.2.1 | UCD | 3.2.1a | ||||||||||||||||||||
2. Analysis of remotely sensing data for 13 potential field sites. | 3.2.2 | UCD, UCLA | 3.2.2a | |||||||||||||||||||||
3. Select, based on set criteria, four candidate sites. | 3.2.3 | UCD, UCB, UCLA | 3.2.3a | |||||||||||||||||||||
3. Evaluation of Candidate Field Sites for Selecting Final Field Trial Site | 1. Prepare site visits to four candidate field sites and nearest mainland. | 3.3.1 | UCD | 3.3.2a | 3.3.2b | 3.3.2c | 3.3.2d | |||||||||||||||||
2. Visit villages on each candidate site and nearest mainland to collect Anopheles specimens. | 3.3.2 | UCD | 3.3.4a | 3.3.4b | 3.3.4c | |||||||||||||||||||
3. Analysis of genotype data to assess entomological parameters | 3.3.3 | UCD | 3.3.5a | 3.3.5b | 3.3.5c | |||||||||||||||||||
4. Analysis of insecticide resistance | 3.3.4 | UCD | 3.3.6a | 3.3.6b | 3.3.6c | |||||||||||||||||||
5. Analysis of genome data to assess degree of genetic isolation of sites | 3.3.5 | UCB | 3.3.7a | 3.3.7b | 3.3.7c | |||||||||||||||||||
6. Model evaluation of candidate field sites | 3.3.6 | UCD | 3.4.1a | 3.4.1b | 3.4.1c | |||||||||||||||||||
4. Assess “Colonizability” of An. gambiae from Candidate Field Sites | 1. Establish mosquito rearing protocols & insectary at UC Davis (UCI has these? Clarify and forward) | 3.4.1 | UCD | 3.4.1a | 3.4.1b | 3.4.1c | ||||||||||||||||||
2. Assess ease of colonization for An. gambiae for each site | 3.4.2 | UCD | 3.4.2a | 3.4.2b | 3.4.2c | |||||||||||||||||||
5. Select Field Trial Site | 1. Prepare a written evaluation of each of the four candidate sites. | 3.5.1 | All | 3.5.1a | ||||||||||||||||||||
2. Make final decision on the project field site | 3.5.2 | All | 3.5.2a | |||||||||||||||||||||
6. Model evaluation of candidate field site | 1. Mosquito Collection and Research Activities at Field Site Union of Comoros | 3.6.1 | UCI UCD | 3.6.1a | ||||||||||||||||||||
2. Determine feasibility of establishing An. coluzzii colony and An. gambiae colony in Grande Comore. | 3.6.2 | UCI UCD | 3.6.2a | |||||||||||||||||||||
3.Conduct preliminary WHO insecticide resistance assays | 3.6.3 | UCI UCD | 3.6.3 | |||||||||||||||||||||
7. Research and Training Activities at UC Davis and UC Irvine | 1. DNA extraction, sequencing and analysis of site collected mosquitoes. | 3.7.1 | UCI UCD | 3.7.1a | ||||||||||||||||||||
2. Provide training at UCI MI for field site collaborators | 3.7.2 | UCI UCD | 3.7.2a | |||||||||||||||||||||
3. Develop plan for field station at field site (more specific) | 3.7.3 | UCI UCD | 3.7.3a | |||||||||||||||||||||
4. Provide training at UCI MI in construct and microinjection. | 3.7.4 | UCI | 3.7.4a | |||||||||||||||||||||
8. Develop and implement timeline/plan for continued research with field site collaborators | 1. Conduct follow up workshop for site collaborators and stakeholders | 3.8.1 | UCI UCD | 3.8.1a | ||||||||||||||||||||
2. Create and implement strategy for next phase of research at field site(s) with collaborators | 3.8.2 | UCI UCD | 3.8.2a | |||||||||||||||||||||
9. Develop Field Station at Field Site | 1. Upgrade or install insectary facilities at Grand Comore | 3.9.1 | UCI UCD | 3.9.1a | ||||||||||||||||||||
2. Upgrade or install laboratory facilities at Grande Comore. | 3.9.2 | UCI UCD | 3.9.2a | |||||||||||||||||||||
3. Evaluate and rent housing for onsite UCI MI staff | 3.9.3 | UCI UCD | 3.9.3a | |||||||||||||||||||||
4. Rent of purchase suitable housing for UCI MI staff | 3.9.4 | UCI UCD | 3.9.4a | |||||||||||||||||||||
5. Acquire necessary furnishings for field station and hire security. | 3.9.5 | UCI UCD | 3.9.5a | |||||||||||||||||||||
10. Hire Field Site Personnel | 1. Recruit, Hire and Train post-doctoral biologist(s) to direct field work at each field site. | 3.10.1 | UCI UCD | 3.10.1a | ||||||||||||||||||||
2. Recruit, Hire and Train administrative personnel to assist with administrative duties at field site. | 3.10.2 | UCI UCD | 3.10.2a | |||||||||||||||||||||
3. Recruit, Hire and Train National/local to site biologist(s) who will work as field station staff. | 3.10.3 | UCI UCD | 3.10.3a | |||||||||||||||||||||
11. Conduct Second Season of Mosquito Sampling at Field Site | 1. Conduct mark release recapture studies | 3.11.1 | UCD | 3.11.1a | ||||||||||||||||||||
2. Sample aquatic organisms co-inhabiting larval mosquito breeding sites | 3.11.2 | UCD | 3.11.2a | |||||||||||||||||||||
12. Marked Release of TPP | 1. 1st release of TPP at selected site | 3.12.1 | All | 3.12.1 | ||||||||||||||||||||
13. Post release evaluations | 1. Recaputue and sequence | 3.13.1 | 3.13.1 | |||||||||||||||||||||
2. Parasites disect and assess for the number of pasasites | 3.13.2 | 3.13.2 | ||||||||||||||||||||||
3. Community Assessment - evaluate the stakeholders and community about the project. | 3.13.3 | 3.13.3 | ||||||||||||||||||||||
Objective 4: Community Engagement | ||||||||||||||||||||||||
1. Build Relationships and Establish Collaborations | 1. Conduct workshops at potential fields sites | 4.1.1 | UCI | 4.1.1a | ||||||||||||||||||||
2. Conduct stakeholder assessment of all sites | 4.1.2 | UCI | 4.1.2a | |||||||||||||||||||||
3. Draft regulatory frameworks for candidate sites | 4.1.3 | UCI | 4.1.3a | |||||||||||||||||||||
4. Documentation and data collection of all communication and engagement | 4.1.4 | UCI | 4.1.4a | |||||||||||||||||||||
2. Site and Community Assessment | 1. Develop and implement community assessment | 4.2.1 | UCI | 4.2.1a | ||||||||||||||||||||
2. Develop and implement educational tools | 4.2.2 | UCI | 4.2.2a | |||||||||||||||||||||
3. Develop process for responding to community (Communication Plan) questions and concerns | 4.2.3 | UCI | 4.2.3a | |||||||||||||||||||||
4. Regulatory Planning with field site collaborators with regulatory consultant (see 1.6.4) | 4.2.4 | UCI | 4.2.4a | |||||||||||||||||||||
5. Refine Communication Plan | 4.2.5 | UCI | 4.2.4a | |||||||||||||||||||||
3. Education and Capacity Building | 1.Recruit and train onsite CE personnel | 4.3.1 | UCI | 4.3.1 | ||||||||||||||||||||
2. Develop and implement training plan | 4.3.2 | UCI | 4.3.2a | 4.3.2b | 4.3.2c | 4.3.2d | 4.3.2e | |||||||||||||||||
3. Begin delivery of public education | 4.3.3 | UCI | ||||||||||||||||||||||
Facilitate communication for regulatory and contractual processes (see 1.4.6) | 4.3.4 | UCI | 4.3.4 | |||||||||||||||||||||
4. Evaluation and Communication Development | 1. Assessment/Evaluation of Public Education and Tools (revise if necessary at this time) | 4.4.1 | UCI | 4.4.1a | 4.4.1b | 4.4.1c | ||||||||||||||||||
2. Report on community and stakeholder support | 4.4.2 | UCI | 4.4.2a | 4.4.2b | ||||||||||||||||||||
4. Evaluation of Stakeholder Groups | 4.4.3 | UCI | 4.4.3a | 4.4.3b | 4.4.3c | |||||||||||||||||||
5. Communication Management | 1. Refinement of Communication Plan | 4.5.1 | UCI | 4.5.1a |