GUIDE STATUS: 
Status
colourGreyGreen
titleDraftPublished
 

  1. In the Filter navigator, enter "Change".
  2. Under the Change tab, click on Create New.

    Image RemovedImage Added

  3. Select a value from the dropdown for the Category field.


    Image RemovedImage Added


  4. Enter a value into the Configuration Item reference field.


    Image RemovedImage Added


  5. Select values for the PriorityRisk, and Impact fields. (Reference the OIT Change Management 2.0 Policy for definitions).)


    Image RemovedImage Added


  6. Select a value for the Type dropdown. (Reference the OIT Change Management 2.0 Policy for definitions).


    Image RemovedImage Added


  7. Fill in values for Assignment groupAssigned To, and check the checkboxes Central QA Required if applicable.

    1. Note: Assign the change request record to your team, not OIT Production Control or P/OM.

    2. If the change is routine, you can uncheck the Approval Required box.


    Image RemovedImage Added


  8. Enter a short description for the change in the Short Description field and and longer, more detailed description in the Description field. This should be high-level, non-technical information.

  9. Enter the hosts that will be affected by the change in the Affected Host(s) field. If none, write "None" into the field.




  10. Under these fields, click on the Schedule tab.


    Image Added

  11. Select the Planned start date and Planned end date for the change.


    Image Added

  12. Enter the duration of the outage (downtime) caused by implementing the change in the Duration field.

    Image Added

  13. Click on the Planning tab.

    Image Added

  14. The following fields are required to be filled out for Comprehensive changes only:
      1. Change Plan - Describe how the change will be implemented.
      2. Communication Plan - Describe how the product stakeholders were made aware of the change.
      3. Test Plan - Describe how the change was tested prior to the deployment.
      4. Backout Plan - Describe how the change will be reversed if there is a problem with the deployment.
      5. HD Planned Maintenance Announcement - Selecting "Yes" will reveal a text box, where you can provide a draft of the Maintenance Announcement that you wish to have posted on the OIT Home Page (www.oit.uci.edu). When the Change Request is submitted, this feature will automatically submit a request to the Web Content Assignment Group.   They will coordinate and complete the Announcement Posting.

    Image Added

  15. Click on the High Risk Addendum tab.

    Image Added

  16. Fill in the What might break as a result of this change? field. (Entering "None" or "N/A" is acceptable).
  17. Fill in the Validation Steps Taken field.
  18. Fill in the Steps Taken to Minimize Risk field. (Entering "Low Risk" or "N/A" is acceptable).

    Image Added

  19. Click the Submit button at the top right of the content frame to submit your change request.

    Image Added

Update Log

Updated ByDateNotes
 
Approved by Chris Nelson. Available for OIT use.
First draft complete. Pending review.
Initial Creation.
Anusha Kethineni (Unlicensed) Updated the page with new UI screenshots