GUIDE STATUS: 
Status
colourGrey
titleDraft
 

  1. In the Filter navigator, enter "Change".
  2. Under the Change tab, click on Create New.


    Image Added

  3. Select a value from the dropdown for the Category field.


    Image Added


  4. Enter a value into the Configuration Item reference field.


    Image Added


  5. Select values for the PriorityRisk, and Impact fields. (Reference the OIT Change Management 2.0 Policy for definitions.)


    Image Added


  6. Select a value for the Type dropdown. (Reference the OIT Change Management 2.0 Policy for definitions.


    Image Added


  7. Fill in values for Assignment groupAssigned To, and check the checkboxes Central QA Required if applicable.

    1. Note: Assign the change request record to your team, not OIT Production Control or P/OM.

    2. If the change is routine, you can uncheck the Approval Required box.


    Image Added


  8. Enter a short description for the change in the Short Description field and and longer, more detailed description in the Description field. This should be high-level, non-technical information.

  9. Enter the hosts that will be affected by the change in the Affected Host(s) field. If none, write "None" into the field.


    Image Added


  10.  

Update Log

Updated ByDateNotes
Michael Anthony Waara Initial Creation.