/
Weekly status 02-21-14

Weekly status 02-21-14

this week:

  •  install VPN client (for access of OIR Orcacle server) and obtain password from john lenning.
  • set up access to OIR SQL SERVER ssoir and ssboir and databases dbdwh and dbload crosschecking with the spread sheet dump from Durendal below.
  • filled up short and long description using OIR data dictionary.
  • filled up dim- spreadsheet data based on OIR_Out.xlsx and cross reference with SQL SERVER database dbdwh.
  • the completed spread sheet OIR metadata combined.xlsx.

Lessons learnt:

next week:

  • OIR non-dimensional data in spreadsheet.