Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Inform and coordinate with EUS /MAI  to get a manual VM snapshot of the target Fuse hosts before starting Fuse Roll-up patch.

...

1. unzip patch-management-package-6.3.0.redhat-329.zip into top level system directory.

Apply Login into karaf console, apply the patch-management upgrade, create a new version,.

2. fabric:version-create 1.3.1

...

6. Backup/remove the org.apache.karaf.exception-<version> jar from the lib/endorsed directory and restart the container.

7. start root container

Upgrade each child containers
Child containers can be mix-bagged of old version and new version (Not recommend though)
8. Container-upgrade 1.3.1 uci-mq-broker, etc.

...

Now upgrade each containers (root container first)  to the roll-up patched version.
upgrading the ensemble containers one at a time and waiting until
they are restarted and in the success state before proceeding to the next.
14. fabric:container-upgrade 1.4 root, etc.

...