10/30/2017
Attendees: Pramod, Eufemia, Anh, Ursula, Valerie
Issues and bugs:
- KFSDW-1718 and KFSDW-1719 are on hold until KFS Upgrade is complete.
Anh: Working on Informatica DBA related tasks. All Award tables ready for Test.
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. KFSDW-1290 is ready to deploy. KFS Upgrade Day One.
Eufemia: Working on KBM JIRA's: KFSDW-1508 is Ready for Test. Working on KFS Upgrade activities.
Ursula: Working on KFS Upgrade activities.
10/23/2017
Attendees: Pramod, Eufemia, Anh, Ursula
Issues and bugs:
- KFSDW-1718 and KFSDW-1719 are on hold until KFS Upgrade is complete.
Anh: Working on Informatica DBA related tasks. KFSDW-1671 is waiting for Pramod and Kevin. All other Award tables ready for Test.
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. KFSDW-1290 is ready to deploy. KFS Upgrade Day One.
Eufemia: Working on KBM JIRA's: KFSDW-1508 finishing report based on completed ETL. Working on KFS Upgrade activities.
Ursula: Working on KFS Upgrade activities.
10/17/2017
Attendees: Pramod, UrsulaEufemia, Anh
Issues and bugs:
- KFSDW-1663 Ursula has set this Ready for Test.
- KFSDW-1640 Eufemia waiting on customer (should be closed)
Anh: Working on Informatica DBA related tasks. KFSDW-1671 is waiting for Kevin. All other Award tables ready for Test. Working on KFSDW-1713
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. KFSDW-1290 is ready for testing. KFS Upgrade Day One.
...
Eufemia:
...
Working on KBM JIRA's: KFSDW-
...
1508 creating new package. KFSDW-1519, KFSDW-1624 JIRA's are now ON HOLD until after KFS Upgrade. Working on KFS Upgrade activities. Documentation on Wiki for SIS/UCPath. Create JIRA's to replicate ETL in dss_kfs7 for KFSDW-1702 and KFSDW-1619.
KFS Upgrade considerations:
...
Attendees: Pramod, Ursula, Anh
Issues and bugs:
- KFSDW-1663 Ursula has set this Ready for Test.
- KFSDW-1640 Eufemia waiting on customer (should be closed)
Anh: Working on Informatica DBA related tasks. KFSDW-1671 is waiting for Kevin. All other Award tables ready for Test. Working on KFSDW-1713
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. KFSDW-1290 is ready for testing. KFS Upgrade Day One.
...
Attendees: Pramod, Ursula, Anh
Issues and bugs:
- KFSDW-1663 Ursula has set this Ready for Test.
- KFSDW-1640 Eufemia waiting on customer (should be closed)
Anh: Working on Informatica DBA related tasks. KFSDW-1671 is waiting for Kevin. All other Award tables ready for Test. Working on KFSDW-1712 and KFSDW-1713
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. KFSDW-1290 is ready for testing. KFS Upgrade Day One.
...
Attendees: Anh, Pramod, Ursula, Eufemia
Issues and bugs:
- KFSDW-1663 Ursula in progress with this report, will release immediately after UAT.
- KFSDW-1698/KFSDW-1697 On hold until after KFS Upgrade.
- KFSDW-1640 Eufemia waiting on customer (should be closed)
...
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries - waiting on Award data. Updated KFS_D_RAFG dimension in LUNAR KFSDW-1290.
Ursula: Working on KFSDW-1709 and KFSDW-1705. Added the new Award Dimension to the DSS-PI model, in testing. Working on KFS Upgrade activities.
...
Attendees: Anh, Pramod, Ursula, Eufemia
Issues and bugs:
- KFSDW-1698 Ursula to follow up with Kevin this week (related to KFSDW-1632).
- KFSDW-1640 Eufemia waiting on customer
Anh: KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. KFSDW-1656 and KFSDW-1671 are in progress. All other Award tables ready for Test.
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries - waiting on Award data. Updated KFS_D_RAFG dimension in LUNAR KFSDW-1290.
Ursula: Working on KFSDW-1709 and KFSDW-1705. Added the new Award Dimension to the DSS-PI model, in testing. Working on KFS Upgrade activities.
...
Attendees: Anh, Pramod, Ursula, Eufemia
Issues and bugs:
- KFSDW-1707 Anh starting work on this
- KFSDW-1684 Ursula working on this
- KFSDW-1698 Ursula to follow up with Kevin this week (related to KFSDW-1632).
- KFSDW-1690 to be deployed this week.
Anh: KFSDW-1496, KFSDW-1669, KFSDW-1670, KFSDW-1672 are in progress to apply Pramod's code review. KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. KFSDW-1656 and KFSDW-1671 are in progress. KFSDW-1702 is ready for test.
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries. Updated KFS_D_RAFG dimension in LUNAR KFSDW-1290.
Ursula: KFSDW-1679 is ready to deploy. Added the new Award Dimension to the DSS-PI model, in testing. Working on KFS Upgrade activities.
...
Attendees: Anh, Pramod, Ursula
Issues and bugs:
- KFSDW-1684 Ursula waiting for customer to respond.
- KFSDW-1698 Ursula to follow up with Kevin (related to KFSDW-1632).
- KFSDW-1690 Pramod to follow up with Kevin
Anh: KFSDW-1496, KFSDW-1669, KFSDW-1670, KFSDW-1672 are Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working with Kevin on KFSDW-1656 and associated sub task: KFSDW-1671. Kevin / Maria to provide updates on KFSDW-1702.
Pramod: Working on KFS Upgrade activities. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries.
Ursula: Working on KFSDW-1679. Added the new Award Dimension to the DSS-PI model, in testing. Working on KFS Upgrade activities.
...
Attendees: Tammy, Anh, Eufemia, Pramod, Ursula
Issues and bugs:
- KFSDW-1684 Ursula waiting for customer to respond.
- KFSDW-1698 Ursula to follow up with Kevin (related to KFSDW-1632).
- KFSDW-1690 Pramod to follow up with Kevin
Eufemia: Working on KBM JIRA's: KFSDW-1503,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: KFSDW-1496, KFSDW-1669, KFSDW-1672 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working with Kevin on KFSDW-1656 and associated sub tasks: KFSDW-1670, KFSDW-1671. Eufemia to go over the KFSDW-1702 with Anh.
...
Attendees: Tammy, Anh, Eufemia, Pramod
Issues and bugs:
- KFSDW-1684 Ursula waiting for customer to respond.
- KFSDW-1698 assign to Ursula (related to KFSDW-1632)
- KFSDW-1690 Pramod to start work on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656 and associated sub tasks: KFSDW-1669, KFSDW-1670, KFSDW-1671, KFSDW-1672.
...
- Pramod to fix column type on KFSDW-1656.
- Kevin to give remaining requirements on KFSDW-1669, KFSDW-1670, and KFSDW-1671
- Pramod to set the identity of a table to 'ON' for KFSDW-1672.
...
Attendees: Tammy, Anh, Eufemia, Ursula
Issues and bugs:
- KFSDW-1695 Eufemia working on making Recharge report run faster.
- KFSDW-1684 Ursula waiting for customer to respond.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656 and associated sub tasks: KFSDW-1669, KFSDW-1670, KFSDW-1671, KFSDW-1672.
Ursula: KFSDW-1679, KFSDW-1563 READY FOR TEST. Working on KFS Upgrade activities.
...
Attendees: Tammy, Anh, Eufemia, Ursula
Issues and bugs:
- KFSDW-1684 Ursula waiting for customer to respond.
- KFSDW-1640
Eufemia is waiting on budget officeJira Legacy server OIT System JIRA columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId 252346bdd1c6a489-c418217f-34af3ae9-94a0bd3a-0709b210881201dc24609c18 key KFSDW-1640
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656 and associated sub tasks: KFSDW-1669, KFSDW-1670, KFSDW-1671, KFSDW-1672.
Ursula: KFSDW-1679, KFSDW-1563 READY FOR TEST. Working on KFS Upgrade activities.
...
Attendees: Ursula, Anh, Eufemia
Issues and bugs:
- KFSDW-1640 Eufemia is waiting on budget office
- KFSDW-1681 Ursula has it READY FOR TEST.
- KFSDW-1682 Ursula is working on
Ursula: PREQ, Disbursement, TEM, PO, and Disbursement Voucher are in UAT, Credit Memo. Working on KFS Upgrade activities.
Eufemia: Maria to test KFSDW-1604 over the next two months to test position history on Staffing List Report.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656 and associated sub tasks: KFSDW-1669, KFSDW-1670, KFSDW-1671, KFSDW-1672.
...
Attendees: Ursula, Pramod, Anh, Eufemia
Issues and bugs:
- KFSDW-1640 Eufemia waiting on budget office
...
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. KFSDW-1404 is Ready for deploy. Add Award_SID to all PURAP accounting fact tables and GL Balance and Ledger entries.
...
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656 and associated sub tasks.
...
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Eufemia waiting on budget office
Ursula: PREQ, Disbursement, TEM, PO, and Disbursement Voucher are in UAT, working on Credit Memo. KFSDW-1663 and is Ready for test.
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. KFSDW-1404 is Ready for test.
...
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 and KFSDW-1646 are Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656
06/19/2017
Attendees: Ursula, Pramod, Anh, (Eufemia)
...
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Eufemia waiting on budget office
Ursula: PREQ, Disbursement, TEM and PO are in UAT, working on Disbursement voucher. KFSDW-1663 is Ready for test.
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. KFSDW-1404 is Ready for test.
...
Anh: KFSDW-1496 is Ready to test, KFSDW-1638 is ready to deploy. KFSDW-1646 is Ready to deploy. Working on Informatica DBA related tasks. Working on KFSDW-1656
06/12/2017
Attendees: Eufemia, Ursula, Pramod, Anh
...
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Eufemia waiting on budget office
Ursula: PREQ, Disbursement, TEM and PO are in UAT, working on Disbursement voucher. Working on KFSDW-1663.
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. KFSDW-1404 is Ready for test.
...
KFSDW-1631 Ready for deploy
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Eufemia waiting on budget office
- KFSDW-1643 Closed
...
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. KFSDW-1404 is Ready for test, .
...
KFSDW-1644 Ready to deploy.
- KFSDW-1631 Ursula to check report dependencies now that JIRA has passed UAT.
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Matt will be unable to complete this report. Eufemia to contact Budget Office to present options and then proceed from there.
- KFSDW-1643 Ursula waiting for customer.
...
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. Working on KFSDW-1404.
...
KFSDW-1644 Eufemia to contact Victor this week to test.
- KFSDW-1631 Ursula to check report dependencies now that JIRA has passed UAT.
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Matt will be unable to complete this report. Eufemia to contact Budget Office to present options and then proceed from there.
- KFSDW-1643 Ursula waiting for customer.
...
KFSDW-1631 Ready for deploy
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Matt working on this one
Ursula: KFSDW-1399 ready for test. Continue working on PURAP model. and DSS_PI model.
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. Working on KFSDW-1404.
Eufemia: Waiting to put KFSDW-1604 in UAT. Continue working with Maria on KBM reports. KFSDW-696 is under technical testing. Working on KFSDW-1084, KFSDW-1519, KFSDW-1518. Also working with Pramod to get requirements for KBM Data Mart from Maria. Working on list of ODS tables for KFS Upgrade.
...
KFSDW-1631 Ready for test
KFSDW-1635 Matt Levin working on this, waiting for customer
- KFSDW-1640 Matt working on this one
Ursula: KFSDW-1399 ready for test. Continue working on PURAP model. and DSS_PI model.
Pramod: Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. Working on KFSDW-1404.
Eufemia: Continue working with Maria on KBM reports. KFSDW-696 is under technical testing. KFSDW-1094, KFSDW-1383 is ready for test. Working on KFSDW-1084, KFSDW-1519, KFSDW-1518. Also working with Pramod to get requirements for KBM Data Mart from Maria. Working on list of ODS tables for KFS Upgrade.
...
Pramod: Credit memo ETL is deployed. Working on KFS Upgrade activities. KFSDW-1630 is Ready for test. Working on KFSDW-1404.
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-696 is under technical testing. KFSDW-1094, KFSDW-1383 is ready for test. Working on KFSDW-1084, KFSDW-1519, KFSDW-1518. Also working with Pramod to get requirements for KBM Data Mart from Maria. Working on list of ODS tables for KFS Upgrade.
...
Pramod: Credit memo scheduled to deploy. Working on KFS Upgrade activities. Working on KFSDW-1630
04/10/2017
Attendees: Ursula, Eufemia, Pramod, Anh
...
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-696 is under technical testing. KFSDW-1094, KFSDW-1383 is ready for test. Working on KFSDW-1084, KFSDW-1519, KFSDW-1518. Also working with Pramod to get requirements for KBM Data Mart from Maria. Working on list of ODS tables for KFS Upgrade.
...
Pramod: Working on testing / coding PURAP Credit memo, and KFS Upgrade activities. Working on KFSDW-1630
04/03/2017
Attendees: Ursula, Eufemia, Pramod, Anh
Issues and bugs:
- KFSDW-1633: deployed by Pramod
KFSDW-1631 Ursula working on. Kevin on vacation. We will talk to Valerie about how the PRCRMNT Acct ITm table joing to the KFS_F_LEDGER_ENTRIES, etc.
KFSDW-1635 Matt Levin working on
...
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-696 is under technical testing. KFSDW-1094, KFSDW-1383 is ready for test. Working on KFSDW-1084, KFSDW-1519, KFSDW-1518. Also working with Pramod to get requirements for KBM Data Mart from Maria. Working on list of ODS tables for KFS Upgrade.
Anh: Working on "https://services.adcom.uci.edu/jira/browse/KFSDW-1429" KFSDW-1617 , "https://services.adcom.uci.edu/jira/browse/KFSDW-1429" KFSDW-1496, and "https://jirauci.oitatlassian.uci.edunet/browse/KFSDW-1634" KFSDW-1634, should be available for test today in DEV. KFS, month-end related activities.
Pramod: Working on testing / coding PURAP Credit memo, and KFS Upgrade activities. Working on KFSDW-1630
03/27/2017
Attendees: Ursula, Eufemia, Pramod, Anh
Issues and bugs:
- KFSDW-1635: Matt reviewing this one
- KFSDW-1631: Ursula working on this one
Ursula: Continue working on KFSDW-1507, KFSDW-1399 (Year-end) ; READY for TEST: KFSDW-1429, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAP packages (PREQ).
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-1519 are READY FOR TEST. Working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: Working on KFSDW-1617 , KFSDW-1496, and KFSDW-1634. KFS related activities.
Pramod: Working on testing / coding PURAP Credit memo, and KFS Upgrade activities. Working on KFSDW-1630
03/20/2017
Attendees: Ursula, Eufemia, Pramod, Anh
Issues and bugs:
- KFSDW-1627: Eufemia reviewing this one
- KFSDW-1631: Ursula working on this one
...
Ursula: Continue working on KFSDW-1507, KFSDW-1602, KFSDW-1399 (Year-end) ; READY for TEST: KFSDW-1429, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAP packages (PREQ).
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-1519 are READY FOR TEST. Working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Pramod: Working on testing / coding PURAP Credit memo, and Requisition ETL and KFS Upgrade activities. Working on KFSDW-1630
Anh: Working on KFSDW-1617 and KFSDW-1496
...
Ursula: Continue working on KFSDW-1507, KFSDW-1602; READY for TEST: KFSDW-1429, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAP packages (PREQ).
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports. KFSDW-1519 are READY FOR TEST. Working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Attendees: Ursula, Eufemia, Pramod
Issues and bugs:
KFSDW-1555 ready for deploy
Tasks:
Ursula: Continue working on KFSDW-1507, KFSDW-1602; READY for TEST: KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAP packages (PREQ).
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Attendees: Ursula, Eufemia, Matt, Anh, Pramod
Issues and bugs:
KFSDW-1555 ready for test
KFSDW-1593 Matt is reviewing
Tasks:
Ursula: Continue working on KFSDW-1507, KFSDW-1602; READY for TEST: KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement & TEM).
Eufemia: Testing KFSDW-1604. Continue working with Maria on KBM reports.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: Waiting on Pramod's confirmation on JIRA:KFSDW-1496. KFSDW-1496 is ready to Test.
Pramod: Working on testing / coding PURAP DV ETL and KFS Upgrade activities.
...
Attendees: Ursula, Eufemia, Anh
Issues and bugs:
KFSDW-914 is READY FOR DEPLOY.
KFSDW-1564, KFSDW-1541 and KFSDW-1555 ready for test.
Tasks:
Ursula: Continue working on KFSDW-1507; READY for TEST: KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement & TEM).
Eufemia: Changing SQL to StaffingbyAcctorOrg_T_NEW ETL to include new Position Dimension, will create new JIRA. Continue working with Maria on KBM reports.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Anh: Working on JIRA:KFSDW-1496
01/30/2017
Attendees: Ursula, Pramod, Eufemia, Matt, Anh
Issues and bugs:
KFSDW-914, KFSDW-1564, KFSDW-1541 and KFSDW-1555 ready for test.
Tasks:
Ursula: Continue working on KFSDW-1507; READY for TEST: KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement).
...
Eufemia: Continue working with Maria on KBM reports.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Change pictures to links.
Matt: Non-KFS related.
Anh: Working on JIRA:KFSDW-1496
01/23/2017
Attendees: Ursula, Pramod, Eufemia, Matt, Anh
Issues and bugs:
Eufemia working on KFSDW-914 from Kevin. Ursula working on KFSDW-1555 and KFSDW-1564.
Tasks:
Ursula: Continue working on KFSDW-1507. READY for TEST, KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement).
...
Eufemia: Continue working with Maria on KBM reports.
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Ursula working on KFSDW-1560. Eufemia working on KFSDW-914 from Kevin.
Tasks:
Ursula: Continue working on KFSDW-1507. READY for TEST, KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement).
...
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Ursula working on KFSDW-1555. Waiting to hear back on KFSDW-914 from Kevin (and whether KFSDW-1323 is needed still).
...
Ursula: Continue working on KFSDW-1507. READY for TEST, KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG & Disbursement).
...
Ursula working on KFSDW-1555. Waiting to hear back on KFSDW-914 from Kevin (and whether KFSDW-1323 is needed still).
...
Ursula: Continue working on KFSDW-1507. READY for TEST, KFSDW-1429, KFSDW-1384, KFSDW-1546. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG).
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Ursula: Continue working on KFSDW-1507. READY for TEST, KFSDW-1429, KFSDW-1384. Continue to work on expediting JIRAs (KFSDW-1546) Has question for Susan. Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG).
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Anh: Analytics ETL undergoing UAT. Working on KFS related tasks. Currently working on KFSDW-1496.
Pramod: Working on KFS Upgrade activities.
...
Ursula: Working on KFSDW-1429, KFSDW-1507. READY for TEST, KFSDW-1384. Continue to work on expediting JIRAs (KFSDW-1546). Continue to work on building PURAPP packages (PO_ITEM & PO_ITEM_ACCTG).
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Matt: Currently working on KFSDW-906.
...
Ursula waiting for ETL team to fix/clean up KFSDW-1545.
Tasks:
Anh: Analytics ETL undergoing UAT. Migrating KFSDW-1537 to Production. Working on KFS related tasks.
...
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: Continue working with Maria on KBM reports ,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: Continue working with Maria on KBM reports
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: Continue working with Maria on KBM reports
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: Maria signed off on MEDCOM changes in ETL. Continue working with Maria on KBM reports
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Ursula: continue working on getting bursted reports pointed to latest versions, and ready for testing. Also continue working on PO package and having users test. Also developing new Disbursement model JIRA KFSDW-1422.
Matt: working on getting bursted reports updated and help test.
Eufemia: will be deploying JIRAs
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Tasks:
Ursula:
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Modeling PO stars in Framework are READY FOR TEST JIRA KFSDW-1422. Currently developing new Disbursement model JIRA KFSDW-1422.
Matt: Only non-KFS reports.
Eufemia: JIRAs ready for test,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Tammy: Continue working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
9/26/2016
Attendees: Eufemia, Matt, Ursula, Anh, Tammy
...
Anh: Continue to work on the SBS aging month end.
Ursula:
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Matt: Only non-KFS reports.
Eufemia: JIRAs ready for test,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Tammy: Continue working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
9/19/2016
Attendees: Eufemia, Matt, Ursula, Anh
...
Ursula:
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Matt: Working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Eufemia: Working on Training material. Continue working Maria on KBM reports,
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
9/12/2016
Attendees: Eufemia, Matt, Ursula, Anh
...
Ursula:
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
.
Matt: Working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
Eufemia: JIRA KFSDW-914; KBM reports; Fixing some reports for Katherine.
Anh:
Jira Legacy | ||||||
---|---|---|---|---|---|---|
|
...
Bugs: Anh working on
Jira Legacy | ||||||||
---|---|---|---|---|---|---|---|---|
|
Issues: Anh will need to 'fix' SBS Aging Talend jobs every month until the ODS Informatica jobs go LIVE, because they overwrite the fixes.
...
Pramod - Working on new addition to balance table, modification of ETL for ITD balances. Design for AP data mart.
5/2/2016
Bug Review
KFSDW-1115 - Eufemia talked to Mat Wilson about FP4, they are trying to include it with security updates in Cognos. The BI team is still evaluating how to test the update.
KFSDW-1244 - Waiting for Accounting to test
All others are ready to deploy or on hold
Issues
KFSDW-1195 - Doc details action taken code - fix is in DB but Matt doesn't see it fixed on the FM package on dev. Matt will try to test this in the framework project directly instead of in the report.
KFSDW-974 - Report devs still need to test ODS tables. We have about 157 reports that will need to be tested. Eufemia will create a JIRA for testing.
KFSDW-1007 - Specs need to be updated. Valerie will discuss in our meeting with Accounting.
...
Eufemia - Waiting for response from Diane on KFSDW-979. Waiting for Kitty on KFSDW-345
...